University of Georgia contractors replacing sanitary lines on Field Street have determined that they must close the street to traffic through Tuesday, Aug. 31, in order to complete construction in the area.
All access to the chemistry building loading dock area is blocked. Access to all other parking and buildings along Field Street may be achieved via flag-controlled two-way traffic from East Campus Road.
For more information, call the Physical Plant Work Order desk at 706/542-7456.